17.11.12

MY 300th POST! (a pictorial summary)




300 posts and a single image to summarise each one.
4.10.10 -  17.11.12


x KL

Thank you for stopping by my blog. You are very welcome and encouraged to comment. I love receiving feedback! I also love watching a new pretty picture box added to my followers - would love you to join me so I can get to know you too!

11 comments:

  1. Congrats K.L & Im looking forward to the next 300!!!

    ReplyDelete
  2. Hey, well done KL! Loved looking at all these pics x

    ReplyDelete
  3. Love it. Great picture. Like your new look.
    Kylie x

    ReplyDelete
  4. Congrats on your 300th post KL!!!!

    Did you somehow automatically generate these or did you have to manually add each photo?

    B

    ReplyDelete
    Replies
    1. Did it manually B....Trawled through each post and chose one from each and then used my new picmonkey toy! X KL

      Delete
  5. wow, what great collages! just goes to show what a fabulous eye you have...so many spectacular images. Congrats darl on the 300th post, and keep them coming!! xx

    ReplyDelete
  6. Sorry to bother you yet again :(

    We've got the NEW concretor booked in for Saturday. MrB has chipped away a few cm off the top of the stuff up so they will be able to pour exposed aggregate over the top. Hopefully it won't chip over time :(

    What I wanted to ask you though is, should we get the path around the front of the house level with the portico as it is now? We do plan on tiling it... but not sure what thickness the tiles will be and if the floor will need to be eavened out and how thick the glue will be...

    Do you think we should estimate the thickness of the tiles and glue and match the the exposed aggregate path to that? Or is is it ok if once the tiles are laid the floor level in the portico is slightly higher? I am a bit worried if it might be a safety hazard if there is a lip ....

    B

    ReplyDelete
  7. congrats! i have no idea how many posts i have done, you have inspired me to go look! x

    ReplyDelete
  8. Thank you guys!!!!

    But the concreter says no :(

    He says the path must be at least 10mm below the damp proof barrier :(
    So we will have a 20mm + step in the end :((((((

    B

    ReplyDelete
    Replies
    1. Ahhh...we didn't know the location of that. Yes, it must be below that. Damn!
      x KL

      Delete
  9. Thanks everyone on your congratulatory messages! A big milestone I reckon and one I know I wouldn't have reached without my followers and comments....Thank you to you too!!!!x KL

    ReplyDelete

I've recently had some problems with not receiving comments. I have removed word verification to try to rectify this issue. If your much appreciated comment doesn't appear please let me know via email so I can try something else! All comments and feedback are warmly welcomed! x KL